One 5m³ mobile storage tank was loaded into a 20GP container on Nov 9 for shipment to Indonesia. It passed full pressure and tightness tests before delivery to suit local tropical conditions, supporting industrial storage projects in Southeast Asia.
Our company successfully exported one cold box to a customer in Algeria. It was loaded on September 27, with subsequent shipment proceeding as planned.
Our pressure regulating device for Malaysia (5 pieces in 1×20GP container) was successfully loaded on August 22. After passing factory and pre‑shipment inspections, the shipment has now entered the logistics phase and is scheduled to depart for Malaysia shortly per the shipping schedule.