One 5m³ mobile storage tank was loaded into a 20GP container on Nov 9 for shipment to Indonesia. It passed full pressure and tightness tests before delivery to suit local tropical conditions, supporting industrial storage projects in Southeast Asia.
Our company successfully exported one cold box to a customer in Algeria. It was loaded on September 27, with subsequent shipment proceeding as planned.
Our pressure regulating device for Malaysia (5 pieces in 1×20GP container) was successfully loaded on August 22. After passing factory and pre‑shipment inspections, the shipment has now entered the logistics phase and is scheduled to depart for Malaysia shortly per the shipping schedule.
The complete filling system (4 pumps, 3 vaporizers, 1 valve handler) for a Malaysia customer was container-loaded on Jul 29–30 and shipped via 2×40HQ+1×20GP, marking a smooth delivery progress.
On July 2, nitrogen generator components were shipped to Algeria in 40HQ and 20GP containers. Strict quality inspections and efficient coordination ensured on-time delivery, with full transit monitoring to guarantee safe and punctual arrival.
On July 1, 500 helium cylinders were shipped to Costa Rica in a 40HQ container. Delivered on time and in full compliance with standards, this order reflects our operational efficiency and strengthens the foundation for future cooperation.