Our pressure regulating device for Malaysia (5 pieces in 1×20GP container) was successfully loaded on August 22. After passing factory and pre‑shipment inspections, the shipment has now entered the logistics phase and is scheduled to depart for Malaysia shortly per the shipping schedule.
The complete filling system (4 pumps, 3 vaporizers, 1 valve handler) for a Malaysia customer was container-loaded on Jul 29–30 and shipped via 2×40HQ+1×20GP, marking a smooth delivery progress.
On July 2, nitrogen generator components were shipped to Algeria in 40HQ and 20GP containers. Strict quality inspections and efficient coordination ensured on-time delivery, with full transit monitoring to guarantee safe and punctual arrival.