Publish Time: 2025-07-11 Origin: Site
The Equipment For Our Client In Turkey Has Been Loaded And Dispatched.
①. A 60-cubic-meter storage tank, shipped as breakbulk cargo, was loaded on July 1st.
②. A set of Liquid to Compressed Natural Gas (L-CNG) refueling station equipment, comprising two 40-foot open top containers (2*40OT) and one 40-foot high cube container (1*40HQ), was successfully loaded on July 9th and July 10th, respectively.All shipments have now departed and are en route to their destination.
▎ Container Loading in Action