Home » News

Project References

封面2.jpg

One 20-cubic-meter storage tank has been loaded into the container on August 15th for export to Costa Rica.

18 August 2025
封面.jpg

The equipment for our client in Turkey has been loaded and dispatched.A 60-cubic-meter storage tank, shipped as breakbulk cargo, was loaded on July 1st.A set of Liquid to Compressed Natural Gas (L-CNG) refueling station equipment, comprising two 40-foot open top containers (2*40OT) and one 40-foot h

11 July 2025

Telephone

+86-153-9713-0007
​Copyright © 2025 Hangzhou ChengYingYi Energy Technology Co.,Ltd. All Rights Reserved.

About Us

Products

Services & Support

News

Subscribe to our newsletter

Promotions, new products and sales. Directly to your inbox.

Address:

1003 room, No.1 building, China Ting Industiral Complex, No. 56-1 Beisha East Road, Linping District, Hangzhou, Zhejiang Province, China, 311103