Home » News

Project References

Shipment of Three 20-Cubic-Meter Storage Tanks to Costa Rica Completed

Recently, our company completed the loading of three 20-cubic-meter industrial storage tanks for export to Costa Rica. The shipment, utilizing three 40-foot high cube containers, was successfully loaded on January 22, marking the official commencement of international logistics for this order.

20m³ Storage Tank Shipped to Costa Rica, Container Loaded on Aug 15

One 20-cubic-meter storage tank has been loaded into the container on August 15th for export to Costa Rica.

Shipment of L-CNG Equipment and Storage Tank Dispatched to Turkey

The equipment for our client in Turkey has been loaded and dispatched.A 60-cubic-meter storage tank, shipped as breakbulk cargo, was loaded on July 1st.A set of Liquid to Compressed Natural Gas (L-CNG) refueling station equipment, comprising two 40-foot open top containers (2*40OT) and one 40-foot h

Telephone

+86-153-9713-0007
​Copyright © 2025 Hangzhou ChengYingYi Energy Technology Co.,Ltd. All Rights Reserved.

Subscribe to our newsletter

Promotions, new products and sales. Directly to your inbox.

Address:

1003 room, No.1 building, China Ting Industiral Complex, No. 56-1 Beisha East Road, Linping District, Hangzhou, Zhejiang Province, China, 311103